Presentation of the project to the customer
The virtual project is discussed with the client
The finished 3D project is evaluated together with the client, with each individual part and detail being mapped and analysed.
During this phase the client is able to immediately see what their new work environment will be like, how the various work areas will be organised, and what kinds of equipment can be stored inside each module. What they will need, and what will have to be rendered available to the operators.
After having agreed upon the best possible technical solution, the economic phase of the process is initiated with a generation of the price quote. It should be noted that the customer's budget is normally analysed between phases 2 and 3, without compromising on the nature of the initial project.
The process concludes with the stipulation of the contract and the issuance of the final designs for the entire project, with technical documentation being provided for the construction of the building, complete with indications regarding the works to be carried out (holes, preparatory works, pipe insertions, etc.), which will help to save money, to prevent errors, and to allocate the budget in the best possible manner.
Throughout the described phases, DEA works alongside the client, and only assumes a consulting role after having moved on to the furniture production stages, which will be described below.